Progress continues on the Great Bathroom Floor Retiling Project of 2009.
Here’s where we were Sunday afternoon, around 5pm.
And here’s where we are now:
Still left to do:
- Grout
- Install floor/wall border
- Install threshold
- Replace toilet and sink
I have a nice long list of dos and don’ts when it comes to tiling. Lessons learned the hard way. But despite all the challenges, I have to say that so far, I’m very happy with the way the floor is turning out. Hopefully this weekend I’ll be able to share final before-and-after photos. And my mom won’t have to walk up two flights of stairs to use the bathroom during her visit.